Results of the project
Project implementation

Activity No. 1

Evaluation of the sawdust quality

Expected Results

Scheduled results

Term of realization

Real realized results

Rest scheduled results

Weigh bridge

1

31.08.2010

1

0

Operation and information system of pellets production

1

31.08.2010

1

0

Digital moisture meters

6

31.08.2010

6

0

Evaluation system of sawdust quality

1

01.12.2012

1

1

Pellets production

12 000

31.12.2012

12 363,2 tons 0

Reduction of CO2 emission - 3 500 tons per year

3 500 tons/year

31.12.2012

6 824 tons

0

 

Activity No. 2

Demonstration process of boiler rooms control

Expected Results

Scheduled results

Term of realization

Real realized results

Rest scheduled results

Demonstration process of boiler rooms control

1

30.09.2011

0

1

 

Activity No. 3

Elaboration of financing program for reconstruction of 20 boiler rooms

Expected Results

Scheduled results

Term of realisation

Real realized results

Rest scheduled results

Financial mechanism for financing the reconstruction of boiler rooms

1

31.12.2010

1 (In January and February 2011 was actualizing the financial mechanism on the base of remark of EC and Mr. Svoboda)

0

Reconstruction of boiler rooms

20

30.09.2012

7

13

Reduction of CO2 emission

2 000

31.12.2012

450

1 550

 

Activity No. 4

Presentation vehicle with equipment

Expected Results

Scheduled results

Term of realisation

Real realized results

Rest scheduled results

Presentation vehicle with the equipment

1

30.08.2010

1

0

Travelling exhibitions

-

25.11.2012

22

-

Reduction of CO2 emission

2 000

31.12.2012

2 186 tons

0

 

Activity No. 5

Creation of INFO CENTRE

Expected Results

Scheduled results

Term of realisation

Real realized results

Rest scheduled results

Realization of INFO CENTRA

1

15.06.2010

1

0

Promotional activities in INFO CENTRE

1 000 visitors annually (2nd a 3rd year)

31.12.2012

1019

0

 

Activity No. 6

Dissemination activities

Expected Results

Scheduled results

Term of realisation

Real realized results

No. of participants / pieces

Rest scheduled results

Conferences

3

1.10.2012

3

260

0

Seminars

6

5.10.2012

6

126

0

Excursions

20

20.8.2012

17

581

3

Trainings

6

1.9.2012

8

118

0

Travel exhibition

-

25.11.2012

22

335

-

Summer biomass camp

3

20.8.2012

2

64

1

Exhibition stand

1

31.8.2012

1

1

0

Presentation in printing media

-

10.9.2012

17

-

-

Presentation in TV media

-

10.9.2012

10

-

-

Participation at the exhibitions

-

31.12.2012

4

-

-

Leaflets

3

30.9.2012

3

6 000

0

Panels

10

30.09.2010

7

7

3

Brochures

2

31.12.2012

2

3 500

0

Another promotion materials

-

31.12.2012

17

8920

-

Book

1

30.9.2012

0

-

1

 

Activity No. 7

Project management and monitoring

Expected Results

Scheduled results

Term of realization

Real realized results

Rest scheduled results

Project reports for EC, monitoring team and MoE SR

6

15.02.2013

5

1

Reports SC

6

15.12.2012

9

0

Audit reports

2

30.12.2012

2

2

After LIFE Communication plan

2 (Slovak and English version)

31.12.2012

0

2

Layman Report

2 (Slovak and English version)

28.12.2012

0

2